• DocumentCode
    1626662
  • Title

    Wind power plant testing and commissioning

  • Author

    Bradt, M. ; Dilling, W. ; Lanz, B. ; Louis, K. ; Nicolai, T. ; Starke, M.

  • fYear
    2011
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    Complete testing and commissioning of the wind plant collector system is a critical step to ensure all equipment and systems are in proper working order prior to system energization and operation. In addition a comprehensive test agenda will ensure baseline data is available for comparing with future test data obtained during normally scheduled maintenance outages. This paper provides a thorough description and methodology for complete testing and commissioning of the wind plant medium voltage collector system and the equipment internal to the wind turbine itself.
  • Keywords
    testing; wind power plants; wind turbines; comprehensive test agenda; normally scheduled maintenance outage; wind plant collector system; wind plant medium voltage collector system; wind power plant testing; wind turbine; Cable insulation; Cable shielding; Optical fiber cables; Power cables; Power transformer insulation; Resistance; Testing; Rho; Wind power plant; commissioning; power cable; resistivity; testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power and Energy Society General Meeting, 2011 IEEE
  • Conference_Location
    San Diego, CA
  • ISSN
    1944-9925
  • Print_ISBN
    978-1-4577-1000-1
  • Electronic_ISBN
    1944-9925
  • Type

    conf

  • DOI
    10.1109/PES.2011.6039424
  • Filename
    6039424