DocumentCode :
1630045
Title :
A New Algorithm for Power System Scheduling Problems
Author :
Sun, Huo-Ching ; Huang, Yann-Chang ; Huang, Kun-Yuan
Author_Institution :
Dept. of Electr. Eng., Cheng Shiu Univ., Kaohsiung
Volume :
1
fYear :
2008
Firstpage :
36
Lastpage :
40
Abstract :
This paper presents a parallel-refined simulated annealing (PRSA) approach for the generator maintenance scheduling (GMS) problem to maximize profit objective function. The merit of simulated annealing (SA) is preserved and the deficiency is pruned away in the proposed PRSA. The proposed PRSA is an effective method because the multiple search trajectories parallel and refined in each stage. The near optimal solution for each trajectory in current state can be derived from the local optimal solutions by using the parallel optimization process. The proposed parallel searching strategy can obtain optimal or near-optimal solution for the GMS problem. This paper has demonstrated the effectiveness and feasibility of applying the proposed approach for the 50-unit GMS problem.
Keywords :
electric generators; maintenance engineering; scheduling; simulated annealing; generator maintenance scheduling problem; parallel searching strategy; parallel-refined simulated annealing; power system scheduling problems; Dynamic programming; Intelligent systems; Large-scale systems; Linear programming; Optimization methods; Power system simulation; Power systems; Scheduling algorithm; Simulated annealing; Sun;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Intelligent Systems Design and Applications, 2008. ISDA '08. Eighth International Conference on
Conference_Location :
Kaohsiung
Print_ISBN :
978-0-7695-3382-7
Type :
conf
DOI :
10.1109/ISDA.2008.200
Filename :
4696174
Link To Document :
بازگشت