DocumentCode
1630505
Title
Heuristics and applications for resource-constrained project scheduling with minimal and maximal time lags
Author
Corner, J.L. ; Foulds, L.R. ; Neumann, K.
Author_Institution
Waikato Univ., Hamilton, New Zealand
fYear
1997
Firstpage
403
Lastpage
408
Abstract
Projects with minimal and maximal time lags between different activities are considered. We model such projects using cyclic activity-on-node networks. Heuristics for various types of optimization problems are discussed. The problem of finding an optimal make-to order production schedule is modelled as a resource-constrained project scheduling problem. We outline what appear to be fruitful areas of further research into certain issues in this field. We conclude that the newly developed models and solution techniques represent useful advances in project scheduling
Keywords
delays; operations research; optimisation; production control; project management; cyclic activity-on-node networks; heuristics; optimization; production schedule; resource-constrained project scheduling; time lags; Capacity planning; Demand forecasting; Economic forecasting; Job shop scheduling; Linear programming; Manufacturing; Processor scheduling; Production; Project management; Prototypes;
fLanguage
English
Publisher
ieee
Conference_Titel
Intelligent Engineering Systems, 1997. INES '97. Proceedings., 1997 IEEE International Conference on
Conference_Location
Budapest
Print_ISBN
0-7803-3627-5
Type
conf
DOI
10.1109/INES.1997.632452
Filename
632452
Link To Document