    Heuristics and applications for resource-constrained project scheduling with minimal and maximal time lags

  • Author

    Corner, J.L. ; Foulds, L.R. ; Neumann, K.

  • Author_Institution
    Waikato Univ., Hamilton, New Zealand
  • fYear
    1997
  • Firstpage
    403
  • Lastpage
    408
  • Abstract
    Projects with minimal and maximal time lags between different activities are considered. We model such projects using cyclic activity-on-node networks. Heuristics for various types of optimization problems are discussed. The problem of finding an optimal make-to order production schedule is modelled as a resource-constrained project scheduling problem. We outline what appear to be fruitful areas of further research into certain issues in this field. We conclude that the newly developed models and solution techniques represent useful advances in project scheduling
  • Keywords
    delays; operations research; optimisation; production control; project management; cyclic activity-on-node networks; heuristics; optimization; production schedule; resource-constrained project scheduling; time lags; Capacity planning; Demand forecasting; Economic forecasting; Job shop scheduling; Linear programming; Manufacturing; Processor scheduling; Production; Project management; Prototypes;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Intelligent Engineering Systems, 1997. INES '97. Proceedings., 1997 IEEE International Conference on
  • Conference_Location
    Budapest
  • Print_ISBN
    0-7803-3627-5
  • Type

    conf

  • DOI
    10.1109/INES.1997.632452
  • Filename
    632452