• DocumentCode
    1634544
  • Title

    Methodologies for testing a 2 MW permanent magnet wind turbine generator

  • Author

    Karmaker, Haran ; Knierim, Glenn A. ; Ho, Mantak ; Palle, Bhaskara

  • Author_Institution
    Global R&D Center, TECO-Westinghouse Motor Co., Round Rock, TX, USA
  • fYear
    2011
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    No known guide exists for testing commercial multi-megawatt size permanent magnet (PM) wind turbine generators. Recently, a project has been approved by IEEE to develop a trial use of a guide for testing PM machines. The first author of this paper is the Chair of the working group volunteering to develop this guide. The working group has started working on the guide and plans to present its work in future. The authors of this paper would like to share their experience on testing a 2 MW wind turbine generator with a PM rotor.
  • Keywords
    permanent magnet generators; rotors; testing; turbogenerators; wind turbines; PM rotor; permanent magnet wind turbine generator; power 2 MW; Generators; IEC standards; Loss measurement; Rotors; Synchronous motors; Testing; Wind turbines; Permanent Magnet; Testing; Wind Generator;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power and Energy Society General Meeting, 2011 IEEE
  • Conference_Location
    San Diego, CA
  • ISSN
    1944-9925
  • Print_ISBN
    978-1-4577-1000-1
  • Electronic_ISBN
    1944-9925
  • Type

    conf

  • DOI
    10.1109/PES.2011.6039715
  • Filename
    6039715