• DocumentCode
    1635308
  • Title

    Initial operation of the Decade Quad in lab mode

  • Author

    Price, D. ; Childers, K. ; Kortbawi, D. ; Sincerny, P. ; Wellington, C. ; Ware, K.

  • Author_Institution
    Maxwell Phys. Int., San Leandro, CA, USA
  • Volume
    2
  • fYear
    1999
  • Firstpage
    1095
  • Abstract
    The Decade Quad NWE Simulator will be in operation at the Arnold Engineering and Development Center in the fall of 1999. In its initial configuration, its four identical modules (Marx, transfer capacitor, coaxial water line and conical MITL) each terminate in a plasma opening switch and large area bremsstrahlung (LAB) loads that combined will produce an X-ray dose of at least 16 krad (Si) over an area of at least 2250 cm/sup 2/. A validation test of the first conical MITL and POS load driven by the Decade Module 2 at Maxwell Physics International has successfully produced an X-ray dose consistent with these performance requirements. The initial assembly and check out of the Decade Quad pulsed power subsystems has been completed and is reported herein. Initial X-ray tests are currently underway.
  • Keywords
    X-ray production; bremsstrahlung; plasma switches; pulse generators; pulsed power supplies; pulsed power switches; Decade Quad NWE Simulator; Decade Quad pulsed power subsystems; Marx generator; X-ray dose; X-ray tests; coaxial water line; conical MITL; large area bremsstrahlung loads; plasma opening switch; transfer capacitor; Assembly; Capacitors; Coaxial components; Jitter; Magnetic switching; Physics; Power engineering and energy; Switches; System testing; Voltage;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Pulsed Power Conference, 1999. Digest of Technical Papers. 12th IEEE International
  • Conference_Location
    Monterey, CA, USA
  • Print_ISBN
    0-7803-5498-2
  • Type

    conf

  • DOI
    10.1109/PPC.1999.823711
  • Filename
    823711