Title :
Initial operation of the Decade Quad in lab mode
Author :
Price, D. ; Childers, K. ; Kortbawi, D. ; Sincerny, P. ; Wellington, C. ; Ware, K.
Author_Institution :
Maxwell Phys. Int., San Leandro, CA, USA
Abstract :
The Decade Quad NWE Simulator will be in operation at the Arnold Engineering and Development Center in the fall of 1999. In its initial configuration, its four identical modules (Marx, transfer capacitor, coaxial water line and conical MITL) each terminate in a plasma opening switch and large area bremsstrahlung (LAB) loads that combined will produce an X-ray dose of at least 16 krad (Si) over an area of at least 2250 cm/sup 2/. A validation test of the first conical MITL and POS load driven by the Decade Module 2 at Maxwell Physics International has successfully produced an X-ray dose consistent with these performance requirements. The initial assembly and check out of the Decade Quad pulsed power subsystems has been completed and is reported herein. Initial X-ray tests are currently underway.
Keywords :
X-ray production; bremsstrahlung; plasma switches; pulse generators; pulsed power supplies; pulsed power switches; Decade Quad NWE Simulator; Decade Quad pulsed power subsystems; Marx generator; X-ray dose; X-ray tests; coaxial water line; conical MITL; large area bremsstrahlung loads; plasma opening switch; transfer capacitor; Assembly; Capacitors; Coaxial components; Jitter; Magnetic switching; Physics; Power engineering and energy; Switches; System testing; Voltage;
Conference_Titel :
Pulsed Power Conference, 1999. Digest of Technical Papers. 12th IEEE International
Conference_Location :
Monterey, CA, USA
Print_ISBN :
0-7803-5498-2
DOI :
10.1109/PPC.1999.823711