• DocumentCode
    1638265
  • Title

    Evaluation of GENCO´s strategy in creating a congested system for exercising market power

  • Author

    Nappu, M.B. ; Bansal, R.C.

  • Author_Institution
    Sch. of Inf. Technol. & Electr. Eng., Univ. of Queensland, St. Lucia, QLD, Australia
  • fYear
    2011
  • Firstpage
    1
  • Lastpage
    7
  • Abstract
    An independent system operator must be able to simulate market performance and to identify participants which have potential points to exercise market power with the purpose of guarantee a safe, transparent and fair competition among market participants. This manuscript recognises the impact of bidding strategy taken by prospective generation company within the potential region to be congested. In this paper a composite method for investigating market power under congestion condition is proposed, which employs shift-factor optimal power flow based LMP-lossless scheme. A 24-bus IEEE Reliability Test system (IEEE-RTS) is employed as the case study to investigate some financial implications of market power under congestion circumstances.
  • Keywords
    load flow; power markets; GENCO strategy evaluation; IEEE reliability test system; LMP-lossless scheme; bidding strategy; independent system operator; market power; shift-factor optimal power flow; Electricity supply industry; Generators; Indexes; Load flow; Monopoly; Production; Reliability; bidding strategy; competitive electricity market; locational marginal prices; marginal cost; market power; market share; optimal power flow; transmission congestion;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power and Energy Society General Meeting, 2011 IEEE
  • Conference_Location
    San Diego, CA
  • ISSN
    1944-9925
  • Print_ISBN
    978-1-4577-1000-1
  • Electronic_ISBN
    1944-9925
  • Type

    conf

  • DOI
    10.1109/PES.2011.6039867
  • Filename
    6039867