DocumentCode
163881
Title
Distributed Generation testing and commissioning
Author
Triplett, Jeffrey M.
Author_Institution
Power Syst. Eng., Marietta, OH, USA
fYear
2014
fDate
18-21 May 2014
Abstract
Distributed Generation (DG) interconnections with utility systems are becoming increasingly common. After a DG application has been processed, all needed studies completed and any required interconnection facilities constructed to accommodate the safe and reliable parallel operation of the DG facility, testing and commissioning is required. This paper will describe typical inspection, testing and commissioning procedures for a range of DG installation sizes and types. Practical experience gained from real-world installations and best practices for utilities will be shared in the form of a sample check list and procedure for smaller inverter-based systems.
Keywords
distributed power generation; inspection; power generation reliability; power system interconnection; power system measurement; distributed generation interconnection; distributed generation testing; inverter-based system; power quality; power reliability; utility system; Certification; Documentation; IEEE standards; Monitoring; Synchronization; Testing;
fLanguage
English
Publisher
ieee
Conference_Titel
Rural Electric Power Conference (REPC), 2014 IEEE
Conference_Location
Fort Worth, TX
ISSN
0734-7464
Print_ISBN
978-1-4799-3322-8
Type
conf
DOI
10.1109/REPCon.2014.6842196
Filename
6842196
Link To Document