• DocumentCode
    163894
  • Title

    Establishment of backup system for failed NC robot

  • Author

    Girish, N. ; Subbaiah, K.M. ; Upendra, K.

  • Author_Institution
    I & PE Dept., NIE, Mysore, India
  • fYear
    2014
  • fDate
    8-8 July 2014
  • Firstpage
    338
  • Lastpage
    342
  • Abstract
    Automotive assembly lines are often characterized by robots´ failures that may result in stoppages of the lines and manual backup of tasks. The phenomena tend to impair throughput rate and products´ quality. Hence, there is a need to develop low cost robot backup system with comparable efficiency. Here, an attempt is made to develop a electro-pneumatic system integrated with PLC as backup of NC Robot. The system developed can work at the time of emergency by replacing the NC robot. By this availability of backup it increases the production capacity, minimizes the line stop time and reduces down time.
  • Keywords
    automobile industry; electropneumatic control equipment; failure analysis; numerical control; programmable controllers; redundancy; robotic assembly; PLC; automotive assembly lines; down time reduction; electro-pneumatic system; failed NC robot; line stop time minimization; product quality; production capacity; robot backup system; robot failures; Clamps; Sensor systems; Service robots; Spot welding; Down Time; Electro-pneumatic; Production capacity; Robot Backup system;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Current Trends in Engineering and Technology (ICCTET), 2014 2nd International Conference on
  • Conference_Location
    Coimbatore
  • Print_ISBN
    978-1-4799-7986-8
  • Type

    conf

  • DOI
    10.1109/ICCTET.2014.6966312
  • Filename
    6966312