DocumentCode :
1640322
Title :
Integrated resource planning at a distribution company level-a case study
Author :
Yassin, I. ; Mahmoud, Shaher A. ; Von Hippel, David F. ; Ahmed, Khaled G. ; Aboul-Fetouh, Ramadan F.
Author_Institution :
Egyptian Electr. Holding Co., Egypt
Volume :
3
fYear :
2004
Firstpage :
1314
Abstract :
The current paper describes the process and results of a case study of long-term integrated resource planning and demand side management (IRP/DSM) at the electricity distribution company level in Egypt. The case study starts with a listing of possible IRP objectives, followed by preparation of a "baseline" demand forecast, supply-side planning, demand side planning, plan integration, and finally quantitative and qualitative comparisons between the candidate integrated plans, resulting in the determination of the preferred IRP plan to be recommended for implementation by the distribution company.
Keywords :
demand side management; distribution networks; load forecasting; power distribution planning; supply and demand; supply chain management; DSM; demand forecasting; demand side management; demand side planning; distribution company; electricity distribution company; integrated resource planning; supply-side planning; Cables; Computer aided software engineering; Costs; Energy management; Global warming; Load management; Marketing and sales; Process planning; Project management; Resource management;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Universities Power Engineering Conference, 2004. UPEC 2004. 39th International
Conference_Location :
Bristol, UK
Print_ISBN :
1-86043-365-0
Type :
conf
Filename :
1492240
Link To Document :
بازگشت