DocumentCode
1642734
Title
Notice of Retraction
Analysis and countermeasures of project cost control in construction enterprises
Author
Ai, Xue
Author_Institution
College of Economics and Management Shenyang Agricultural University Shenyang, Liaoning province, China
fYear
2011
Firstpage
1
Lastpage
4
Abstract
Notice of Retraction
After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE´s Publication Principles.
We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.
The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.
Project cost of construction enterprises includes direct costs and indirect costs. The absence of segregation in responsibilities, the barriers exits in cost information transmitting, lack of cost control criteria, the low technological level of construction workers, lack of cost analysis and evaluation mechanism are the main problems exit in project cost control of construction enterprises. The paper puts forward countermeasures on these problems such as pre-planning the cost of construction projects, controlling on the labor costs during construction cost, assuring bulk materials purchased by bidding, implementing limited-materials system, management on turnover materials and turnover utensils, using lump-sum approach on supplementary materials, controlling over the construction period, controlling over mechanical cost, controlling over the project quality and establishing mechanisms for cost analysis and evaluation.
After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE´s Publication Principles.
We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.
The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.
Project cost of construction enterprises includes direct costs and indirect costs. The absence of segregation in responsibilities, the barriers exits in cost information transmitting, lack of cost control criteria, the low technological level of construction workers, lack of cost analysis and evaluation mechanism are the main problems exit in project cost control of construction enterprises. The paper puts forward countermeasures on these problems such as pre-planning the cost of construction projects, controlling on the labor costs during construction cost, assuring bulk materials purchased by bidding, implementing limited-materials system, management on turnover materials and turnover utensils, using lump-sum approach on supplementary materials, controlling over the construction period, controlling over mechanical cost, controlling over the project quality and establishing mechanisms for cost analysis and evaluation.
Keywords
Bars; Companies; Construction industry; Machinery; Maintenance engineering; Materials; construction enterprise; material cost control; project cost control; quality cost control;
fLanguage
English
Publisher
ieee
Conference_Titel
E -Business and E -Government (ICEE), 2011 International Conference on
Conference_Location
Shanghai, China
Print_ISBN
978-1-4244-8691-5
Type
conf
DOI
10.1109/ICEBEG.2011.5881964
Filename
5881964
Link To Document