• DocumentCode
    1647820
  • Title

    Multi-objective multi-execution mode resource-limited optimization of fuzzy project scheduling

  • Author

    Shixia, Duan ; Juan, Pu ; Xiaoli, He ; Han, Zhang

  • Author_Institution
    Department of Management Engineering, Zhengzhou University, Zhengzhou, China
  • fYear
    2011
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    It is always a research hot spot of resource constraints project scheduling. However, with development of economy, project scheduling environment is also changing, some uncertain factors influences project scheduling seriously. It is resource constraints fuzzy project scheduling. This paper studies the problem of resource constraints project scheduling, and it also researches more exec-mode pattern project scheduling which is more realistic. In this paper, it designs a new optimization algorithm that is GLS (a new optimization algorithm — GLS is proposed in this paper). Based on linear weighted utility function, GLS combines the multi-objective combinatorial problems into single objective combinatorial optimization problem, then generates target weight coefficient vector to solving minimization problem. At last the authors prove certain advantages of this proposed method comparing with contrast validation methods.
  • Keywords
    Algorithm design and analysis; Genetic algorithms; Indexes; Job shop scheduling; Optimization; Processor scheduling; fuzzy environment; multi-objective more-exec mode; project scheduling; resource constraints;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    E -Business and E -Government (ICEE), 2011 International Conference on
  • Conference_Location
    Shanghai, China
  • Print_ISBN
    978-1-4244-8691-5
  • Type

    conf

  • DOI
    10.1109/ICEBEG.2011.5882172
  • Filename
    5882172