DocumentCode :
1649422
Title :
A new approach for predicting project duration using beta shape membership functions and simulation
Author :
Khanmohammadi, S. ; Jassbi, J.
Author_Institution :
Dept. of Ind. Manage., Islamic Azad Univ., Tehran, Iran
fYear :
2010
Firstpage :
1
Lastpage :
5
Abstract :
In this paper a new approach for predicting the project duration is introduced. Fuzzy values with beta shape memberships are used - Instead of using the pessimistic, most likely and optimistic values - for estimating the durations of activities. Also the possibility of performing any activity in estimated duration is taken to account by using beta shape memberships for a reliable estimating of activity duration. The delay times of activities caused by environment are also considered. The Mont Carlo simulation is used for comparing the results obtained by the introduced method and the classic PERT.
Keywords :
Monte Carlo methods; PERT; critical path analysis; fuzzy set theory; project management; Monte Carlo simulation; PERT; activity duration estimation; beta shape membership function; critical path method; delay time; fuzzy value; optimistic value; program evaluation and review technique; project duration; Delay; Finishing; Fuzzy logic; Fuzzy sets; Probability; Project management; Shape; Beta shape membership; Critical Path; Fuzzy Possibility; delay time;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Computers and Industrial Engineering (CIE), 2010 40th International Conference on
Conference_Location :
Awaji
Print_ISBN :
978-1-4244-7295-6
Type :
conf
DOI :
10.1109/ICCIE.2010.5668164
Filename :
5668164
Link To Document :
بازگشت