Duane Arnold Energy Center-implementation of surface enhancements to control room panels
Author
Lessly, R.E. ; Watson, M.E. ; Ali, H.S. ; Hill, K.L. ; Schlesinger, R.A.
Author_Institution
Iowa Electr. Light & Power Co., Cedar Rapids, IA, USA
fYear
1988
Firstpage
185
Lastpage
188
Abstract
Iowa Electrical Light & Power Company´s Duane Arnold Energy Center (DAEC) completed surface enhancement of all control-room panels. This resolved a majority of the human engineering deficiencies (HEDs) identified during the Detailed Control Room Design Review (DCRDR) study. Operations staff involvement and emphasis on providing functional changes resulted in operational effectiveness. Procedure modifications were incorporated simultaneously with the changes to minimize the introduction of additional new HEDs. It was concluded that operator response was overwhelmingly positive to the accomplished refinement of the man-machine interface.<>
Keywords
control facilities; human factors; user interfaces; Detailed Control Room Design Review; Duane Arnold Energy Center; control room panels; human engineering deficiencies; man-machine interface; operator response; surface enhancements; Costs; Cyclic redundancy check; Disaster management; Energy resolution; Ergonomics; Human factors; Lighting control; Power engineering and energy; Switches; Transient analysis;
fLanguage
English
Publisher
ieee
Conference_Titel
Human Factors and Power Plants, 1988., Conference Record for 1988 IEEE Fourth Conference on
Conference_Location
Monterey, CA, USA
Type
conf
DOI
10.1109/HFPP.1988.27500
Filename
27500
Link To Document