• DocumentCode
    1650491
  • Title

    Using branch and bound method and optimal placement of phasor measurement unit of power network in Khouzestan province in Iran

  • Author

    Moarref, B. ; Mehdipour, Aidin ; Yazdanipour, M.

  • Author_Institution
    Dept. of Eng., Islamic Azad Univ., Dezful, Iran
  • fYear
    2012
  • Firstpage
    1
  • Lastpage
    6
  • Abstract
    In this paper the optimal positioning of the phasor measuring units is done for complete monitoring the power network in Khouzestan province in Iran. Here a goal function is introduced based on the (ILP) integer linear programming to find the optimal number and position for PMUs. Also the key posts effects are studied. Topological method is used to formulate the monitoring analysis for the network. ILP method is applied for the standard IEEE network as well as the networks in Khouzestan province. The simulation results show that the 400 and 230 KV networks in Khouzestan province can be completely monitored by installing PMUs on 27 percent of buses.
  • Keywords
    integer programming; linear programming; phasor measurement; tree searching; ILP method; Iran; Khouzestan province; PMU; branch and bound method; integer linear programming; monitoring analysis; optimal placement; phasor measurement unit; power network; topological method; voltage 230 kV; voltage 400 kV; Current measurement; Equations; Estimation; Mathematical model; Monitoring; Phasor measurement units; Voltage measurement; observability; optimal; phasor; placement; power;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power Electronics, Drives and Energy Systems (PEDES), 2012 IEEE International Conference on
  • Conference_Location
    Bengaluru
  • Print_ISBN
    978-1-4673-4506-4
  • Type

    conf

  • DOI
    10.1109/PEDES.2012.6484272
  • Filename
    6484272