• DocumentCode
    1650542
  • Title

    Enhancing network efficiency lead time reduction in a three-level supply chain

  • Author

    Valéra, Ludovick ; Lagacé, Denis ; Bergeron, Line

  • Author_Institution
    Dept. of Ind. Eng., Univ. du Quebec a Trois-Rivieres, Trois-Rivières, QC, Canada
  • fYear
    2010
  • Firstpage
    1
  • Lastpage
    6
  • Abstract
    The study illustrates the supply chain management (SCM) of Canadian companies in the furniture industry, including a reduction of lead times, communication, logistics, and supply chain integration. This paper uses a 2-year case study of a supply chain network composed of one large firm and several small- and medium-sized firms (SMEs). It also uses the Supply Chain Operations Reference (SCOR) model to analyze and evaluate the performance of the supply chain. The results, based on an evaluation of strengths and weaknesses, for the basis for a number of recommendations, which may subsequently be used by the companies concerned to increase their potential of becoming world-class performers. Process integration and standardization, inter-organizational information system (IOIS) implementation, manufacturing process improvement, and logistics are found to be the most critical factors for supporting the supply chain network. In light of these results, the study discusses the implications of the findings and suggests several avenues for future research.
  • Keywords
    furniture industry; logistics; manufacturing processes; organisational aspects; small-to-medium enterprises; supply chain management; Canadian companies; communication reduction; furniture industry; inter-organizational information system; lead times reduction; logistics reduction; manufacturing process improvement; network efficiency lead time reduction; performance evaluation; process integration; process standardization; small-and medium-sized firms; strength evaluation; supply chain integration; supply chain management; supply chain operations reference model; weakness evaluation; Collaboration; Companies; Delay; Industries; Supply chains; SCOR model; Supply Chain Management (SCM); case study; lead time reduction; small- and medium-sized enterprise (SME);
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Computers and Industrial Engineering (CIE), 2010 40th International Conference on
  • Conference_Location
    Awaji
  • Print_ISBN
    978-1-4244-7295-6
  • Type

    conf

  • DOI
    10.1109/ICCIE.2010.5668213
  • Filename
    5668213