• DocumentCode
    1652798
  • Title

    Applying constraint management theory in a wafer fab

  • Author

    Villforth, Robert

  • Author_Institution
    Nat. Semicond. Corp., South Portland, ME, USA
  • fYear
    1994
  • Firstpage
    175
  • Lastpage
    178
  • Abstract
    This paper reviews National Semiconductor´s experience in applying constraint management techniques at an integrated circuit wafer fabrication factory in South Portland, Maine. It explains why constraint management was undertaken and the effect that constraint management techniques have had on product shipments, inventory, cycle times, and due date delivery performance. The process of identifying bottleneck tools, the methods used to increase tool output, and the synchronization of tool output and inventory are described. The effect of factory indices and information systems on employee behavior and the strategies used to convince people to behave differently are also described. The theory of constraint concepts is briefly reviewed
  • Keywords
    integrated circuit manufacture; National Semiconductor; bottleneck tools; constraint management theory; cycle times; due date delivery performance; employee behavior; factory indices; information systems; integrated circuit wafer fabrication factory; inventory; product shipments; tool output; tool output/inventory synchronization; Assembly; CMOS integrated circuits; Constraint theory; Fabrication; Integrated circuit yield; Inventory management; Large scale integration; Management information systems; Manufacturing; Production facilities;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Advanced Semiconductor Manufacturing Conference and Workshop. 1994 IEEE/SEMI
  • Conference_Location
    Cambridge, MA
  • Print_ISBN
    0-7803-2053-0
  • Type

    conf

  • DOI
    10.1109/ASMC.1994.588237
  • Filename
    588237