Title :
Upgrading the process control system at GCC Rio Grande´s Tijeras, New Mexico plant
Author :
Aragonez, O. ; Aguilar, Omar
fDate :
6/24/1905 12:00:00 AM
Abstract :
The Tijeras, New Mexico plant is located about 6 miles east of Albuquerque just south of Interstate 40 nestled in the Southern Rocky mountains. The plant is in Tijeras (Spanish for Scissors) canyon at an elevation of 6,300 feet or 1920 meters above sea level. It was originally built by Ideal Cement Company, and the first clinker from the new plant was produced on May 6, 1959. This paper describes a project to upgrade this cement plant´s process control system
Keywords :
cement industry; maintenance engineering; process control; project engineering; USA; cement plant; dry kiln; process control system; upgrade projects; Aging; Cement industry; Centralized control; Control systems; Kilns; Milling machines; Process control; Programmable control; Sea level; Voltage control;
Conference_Titel :
Cement Industry Technical Confernece, 2002. IEEE-IAS/PCA 44th
Conference_Location :
Jacksonville, FL
Print_ISBN :
0-7803-7254-9
DOI :
10.1109/.2002.1006516