DocumentCode
1659053
Title
Notice of Retraction
The optimal incentive contract for a closed-loop supply chain based on principal-agent
Author
Wenqian Lu
Author_Institution
Inst. of Constr. Project Manage., Hohai Univ., Nanjing, China
Volume
3
fYear
2010
Firstpage
16
Lastpage
19
Abstract
Notice of Retraction
After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE´s Publication Principles.
We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.
The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.
It is significant to coordinate interest distribution and improve the overall efficiency of closed-loop supply chain system. In this paper, we explore a two-level CLSCS comprised of a manufacturer and a retailer. Considering substitutability and uncertainty in closed-loop supply chain under information asymmetry condition, we propose a multi-task principal-agent model to maximize expected income of manufacturer and certainty equivalence income of retailer. Analysis results show the manufacturer will design incentive coefficients and the retailer will adjust effort levels according to risk-averse degree, external uncertainty and correlation coefficient of the marginal effort cost.
After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE´s Publication Principles.
We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.
The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.
It is significant to coordinate interest distribution and improve the overall efficiency of closed-loop supply chain system. In this paper, we explore a two-level CLSCS comprised of a manufacturer and a retailer. Considering substitutability and uncertainty in closed-loop supply chain under information asymmetry condition, we propose a multi-task principal-agent model to maximize expected income of manufacturer and certainty equivalence income of retailer. Analysis results show the manufacturer will design incentive coefficients and the retailer will adjust effort levels according to risk-averse degree, external uncertainty and correlation coefficient of the marginal effort cost.
Keywords
closed loop systems; contracts; incentive schemes; supply chain management; closed-loop supply chain; information asymmetry condition; manufacturer; multitask principal-agent model; optimal incentive contract; retailer; closed-loop supply chain; incentive contract; multi-task principal-agent; overall efficiency;
fLanguage
English
Publisher
ieee
Conference_Titel
Advanced Management Science (ICAMS), 2010 IEEE International Conference on
Conference_Location
Chengdu
Print_ISBN
978-1-4244-6931-4
Type
conf
DOI
10.1109/ICAMS.2010.5553298
Filename
5553298
Link To Document