DocumentCode
1661419
Title
A bicriteria scheduling problem with earliness and tardiness penalties
Author
Tsiushuang, Chen ; Xiangtong, Qi ; Fengsheng, Tu
Author_Institution
Dept. of Comput. & Syst. Sci., Nankai Univ., Tianjin, China
Volume
2
fYear
1994
Firstpage
1577
Abstract
In this paper, we study the problem of scheduling n jobs on a single machine to minimize the total earliness penalties subject to a maximum tardiness penalty of each job. From the viewpoint of multicriteria scheduling, the problem is different from the E/T scheduling problems mostly studied in the literature. A heuristic algorithm and a branch and bound algorithm are proposed, computational results are reported
Keywords
heuristic programming; minimisation; production control; bicriteria scheduling problem; branch-and-bound algorithm; heuristic algorithm; maximum tardiness penalty; total earliness penalty minimization; Constraint optimization; Heuristic algorithms; Optimal scheduling; Processor scheduling; Production systems; Scheduling algorithm; Single machine scheduling; Tellurium;
fLanguage
English
Publisher
ieee
Conference_Titel
Decision and Control, 1994., Proceedings of the 33rd IEEE Conference on
Conference_Location
Lake Buena Vista, FL
Print_ISBN
0-7803-1968-0
Type
conf
DOI
10.1109/CDC.1994.411218
Filename
411218
Link To Document