• DocumentCode
    1666110
  • Title

    Notice of Retraction
    Research of risk management of cooperative design project in design institute

  • Author

    Wu, Weihong ; Zhang, Aimei ; Wang, Ruirui ; Gao, Xu

  • Author_Institution
    School of Economic and Management Beijing University of Chemical Technology Beijing China
  • fYear
    2011
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    Notice of Retraction

    After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE´s Publication Principles.

    We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.

    The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.

    With the economic development, trends of projects of large scale and complex become evident, and cooperative design also will be more common. Because cooperative design involves many subjects, some problems may appear, such as division of labor, poor communication. They will bear some risk, mainly involving schedule delays, increased costs, inferior quality and so on. Risk management should be developed that risk management systems, risk registration system, early warning system, a good communication mechanism, a strong monitoring measures and making the project summary should be included.
  • Keywords
    Buildings; Chemical technology; Cognition; Economics; Educational institutions; Petrochemicals; Risk management; cooperative design; project; risk management;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    E -Business and E -Government (ICEE), 2011 International Conference on
  • Conference_Location
    Shanghai, China
  • Print_ISBN
    978-1-4244-8691-5
  • Type

    conf

  • DOI
    10.1109/ICEBEG.2011.5884525
  • Filename
    5884525