DocumentCode
1668968
Title
Lot Sizing with Non-Zero Setup Times for Rework
Author
Haji, A. ; Haji, R. ; Sajadifar, S.M.
Author_Institution
IE Dept., Sharif Univ. of Tech., Tehran
Volume
1
fYear
2006
Firstpage
267
Lastpage
271
Abstract
In this paper we consider a single machine multi-product lot scheduling problem in which defective items are produced in any production run of each product. In each cycle after the normal production of each product the machine is setup for the rework of the defectives of the same product and then the rework process starts. We assume that the setup time for the normal production process as well as the rework process is non-zero. This paper has two objectives. The first objective is to obtain the economic batch quantity (EBQ) for a single product. The second objective is to extend the result of the first objective to the multi-product case. Adopting the common cycle scheduling policy we obtain optimal batch sizes for each product such that the total cost of the system per unit time is minimized
Keywords
batch production systems; lot sizing; quality control; single machine scheduling; stock control; defective item rework process; economic batch quantity; inventory control; lot sizing; nonzero setup time; normal production process; optimal batch sizes; production control; single machine multiproduct lot scheduling; Batch production systems; Cost function; Inspection; Inventory control; Job shop scheduling; Lot sizing; Manufacturing; Optimal scheduling; Production control; Single machine scheduling; Inventory control; Lot Scheduling; Production Control; Rework;
fLanguage
English
Publisher
ieee
Conference_Titel
Service Systems and Service Management, 2006 International Conference on
Conference_Location
Troyes
Print_ISBN
1-4244-0450-9
Type
conf
DOI
10.1109/ICSSSM.2006.320624
Filename
4114444
Link To Document