• DocumentCode
    1673305
  • Title

    Maintenance Activities Scheduling Under Competencies Constraints

  • Author

    Marmier, François ; Varnier, Christophe ; Zerhouni, Noureddine

  • Author_Institution
    Lab. d´´Automatique de Besancon, UMR, Besancon
  • Volume
    2
  • fYear
    2006
  • Firstpage
    1217
  • Lastpage
    1222
  • Abstract
    Competencies management in the industry is one of the most important keys in order to obtain good performance with production means. Especially in maintenance services field where the different practical knowledge or skills are their working tools. We propose a methodology, which compares the human resource with parallel machine. As human resource competence levels of each are all different, they are considered like unrelated parallel machines. Our aim is to assign tasks to the adequate resources by minimizing time treatment for each task and the makespan
  • Keywords
    human resource management; labour resources; maintenance engineering; scheduling; competency management constraints; human resource; maintenance activity scheduling; parallel machine; Availability; Contracts; Electric breakdown; Humans; Job shop scheduling; Machinery production industries; Parallel machines; Preventive maintenance; Qualifications; Remote monitoring; Competence; Contract; Human Resource; Maintenance; Scheduling; Unrelated Parallel Machine;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Service Systems and Service Management, 2006 International Conference on
  • Conference_Location
    Troyes
  • Print_ISBN
    1-4244-0450-9
  • Electronic_ISBN
    1-4244-0451-7
  • Type

    conf

  • DOI
    10.1109/ICSSSM.2006.320682
  • Filename
    4114664