DocumentCode
1673513
Title
Experience with replacing rotating exciters with static exciters
Author
Dallachy, J.L. ; Anderson, T.
fYear
1996
fDate
2/6/1996 12:00:00 AM
Firstpage
42401
Lastpage
42405
Abstract
Scottish Power and Scottish Hydro have completed the upgrade of the Anglo/Scottish interconnector from 850 MW to 1600 MW. This involved rebuilding the West Coast (Strathaven/Harker) line to allow one circuit to be operated at 400 kV (the other remained at 275 kV), and the installation of static excitation systems at Longannet and Hunterston power stations to improve generator stability under system fault conditions. This paper describes the installation and commissioning of the new excitation systems at Longannet
fLanguage
English
Publisher
iet
Conference_Titel
Generator Excitation Systems and Stability, IEE Colloquium on
Conference_Location
London
Type
conf
DOI
10.1049/ic:19960109
Filename
500115
Link To Document