  • Abstract
    This substation evacuates the electric power from the biggest hydropower station on the Danube River (900 MW). Because of the land restrictions in that area this susbstation got a special economical geometric design. Partial disconnection of the busbar sections does not allow painting, since the standard minimum working distances in off-line conditions cannot be respected, due to the special geometry of the structures. Therefore live-line procedures had to be developed for the proposed works.
  • Keywords
    hydroelectric power; power overhead lines; substations; economical geometric design; electric power; hydropower station; live-line procedures; partial disconnection; structures painting; substation; Geometry; Hydroelectric power generation; Isolators; Layout; Painting; Substations; busbar; electric overhead line; live-line; painting; substation; truck aerial platform;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Transmission and Distribution Construction, Operation and Live-Line Maintenance (ESMO), 2011 IEEE PES 12th International Conference on
  • Conference_Location
    Providence, RI
  • ISSN
    2152-985X
  • Print_ISBN
    978-1-4577-0566-3
  • Type

    conf

  • DOI
    10.1109/TDCLLM.2011.6041628
  • Filename
    6041628