DocumentCode
1682175
Title
Cycle Time in Assembly Line Balancing Problem
Author
Grzechca, Waldemar
Author_Institution
Inst. of Autom. Control, Silesian Univ. of Technol., Gliwice, Poland
fYear
2011
Firstpage
171
Lastpage
174
Abstract
In the paper assembly line balancing problem is discussed. Author focuses on cycle time. The importance of its value is shown. Different measures of final results of assembly line balance are presented. A numerical example is calculated. At the end remarks and final conclusions are given.
Keywords
assembly planning; automobile manufacture; assembly line balancing problem; automobile manufacturing; cycle time; Assembly; Companies; Indexes; Production; Silicon; Workstations; assembly line balancing problem; cycle time; heuristic methods; manufacturing systems; schedule planning;
fLanguage
English
Publisher
ieee
Conference_Titel
Systems Engineering (ICSEng), 2011 21st International Conference on
Conference_Location
Las Vegas, NV
Print_ISBN
978-1-4577-1078-0
Type
conf
DOI
10.1109/ICSEng.2011.38
Filename
6041834
Link To Document