Title :
“Geotechnical investigations for above-ground electric transmission structures in New England”
Author :
McAllister, Gary R. ; Kwiatkowski, Terese M.
Author_Institution :
GZA GeoEnviron., Inc., USA
Abstract :
This paper discusses goals and challenges to be considered in planning a geotechnical investigation program for the design of high voltage and extra high voltage overhead electrical transmission line structure foundations in New England, based on practical lessons learned on recent projects. The topics presented herein are not necessarily unique to overhead transmission projects or to New England; however, in combination, the topics help illustrate the scope and key objectives of a successful exploration program, which may be distinct from general building, transportation, and other infrastructure projects in other locales.
Keywords :
power overhead lines; power transmission planning; New England; above-ground electric transmission structures; geotechnical investigations; overhead electrical transmission line structure foundations; overhead transmission projects; planning; Ice; Laboratories; Periodic structures; Rocks; Soil; Foundations; Geotechnical; Investigation; New England; Subsurface; Transmission;
Conference_Titel :
Transmission and Distribution Construction, Operation and Live-Line Maintenance (ESMO), 2011 IEEE PES 12th International Conference on
Conference_Location :
Providence, RI
Print_ISBN :
978-1-4577-0566-3
DOI :
10.1109/TDCLLM.2011.6042221