DocumentCode :
1693490
Title :
Transient multiple hoist scheduling of consecutive cyclic schedules
Author :
Fröhlich, Ralf ; Steneberg, Steffen C.
Author_Institution :
Inst. of Autom., Hamburg Univ. of Technol., Hamburg, Germany
fYear :
2011
Firstpage :
357
Lastpage :
362
Abstract :
This paper addresses the transient multi-hoist scheduling problem in flexible manufacturing facilities and focuses on the Lot Switching procedure. The problem arises in automated electroplating lines where multiple hoists are operating on a shared track and due to a flexible production different product types needs to be manufactured which differ in the routing through the facility. The considered processing sequences may contain loops, i.e. multiple usages of single machines within a sequence. In addition the electroplating line may be equipped with identical machines used as parallel resources. A mixed integer linear programming (MILP) model for optimizing the Lot Switching schedule is presented considering in particular collisions of hoists. A real world example indicating that the model finds schedules for the transition in reasonable time is presented.
Keywords :
dynamic scheduling; flexible manufacturing systems; integer programming; linear programming; single machine scheduling; MILP; automated electroplating lines; consecutive cyclic schedules; lot switching procedure; manufacturing facilities; mixed integer linear programming; single machines; transient multiple hoist scheduling; Finishing; Loading; Optimal scheduling; Production; Schedules; Switches; Transient analysis;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Automation Science and Engineering (CASE), 2011 IEEE Conference on
Conference_Location :
Trieste
ISSN :
2161-8070
Print_ISBN :
978-1-4577-1730-7
Electronic_ISBN :
2161-8070
Type :
conf
DOI :
10.1109/CASE.2011.6042420
Filename :
6042420
Link To Document :
بازگشت