DocumentCode :
169471
Title :
Implementation of an advanced Recipe Management System in a fully automated 300mm fab
Author :
Lu, Albert ; Hanan, Jeff ; Drinkwine, Kevin ; Gupta, Gaurav ; Weber, Andreas ; Hanisch, Matthias ; Cogut, Dan ; Sinn, Robert ; Green, Gary
Author_Institution :
GLOBALFOUNDRIES, Malta, NY, USA
fYear :
2014
fDate :
19-21 May 2014
Firstpage :
293
Lastpage :
298
Abstract :
As the business landscape becomes more complex, high tech companies will invariably need to significantly improve their factory systems or replace them completely. The success, speed, and cost to convert the factory´s systems depend on key factors such as the organization of the team and the approach they take. In this paper, we illustrate how we created a high performance matrix team and used lean manufacturing techniques to fully swap out the recipe management system and replaced it with a commercial product in an advanced fully automated 300mm fab. We will walk through some important aspects of how we successfully created a team that accomplished more scope in less time.
Keywords :
human resource management; lean production; semiconductor device manufacture; team working; advanced recipe management system; automated 300mm fab; commercial product; high performance matrix team; lean manufacturing techniques; Buildings; Continuous improvement; Manufacturing; Organizations; Production facilities; Training; Visualization; High Performing Matrix Team; Lean Manufacturing; Lean Startup; Recipe Management System;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Advanced Semiconductor Manufacturing Conference (ASMC), 2014 25th Annual SEMI
Conference_Location :
Saratoga Springs, NY
Type :
conf
DOI :
10.1109/ASMC.2014.6847024
Filename :
6847024
Link To Document :
بازگشت