DocumentCode
1695732
Title
Method for hot rolling planning considering material requirements of downstream production lines
Author
Tu, Naiwei ; LUO, Xiaochuan ; Huang, Hui ; Chai, Tianyou ; Zheng, Binglin
Author_Institution
Key Lab. of Integrated Autom. for Process Ind., Northeastern Univ., Shenyang, China
fYear
2010
Firstpage
1690
Lastpage
1695
Abstract
Hot rolling planning in steel and iron production process is analyzed and a prize-collecting vehicle routing problem model with uncertain rolling planning numbers for hot rolling planning is presented with balancing the workloads of downstream production lines as one objective. The model considers the jump limit of discharging temperature, finishing rolling temperature and coiling temperature of adjacent slabs, the rolling position of slab surface grade and mix rolling of multiple rolling type slabs, but also considers the reasonable arranging of warm-up materials and staple materials. A two-stage algorithm based on Variable Neighborhood Tabu Search is designed to solve the model. Computational experiments with industrial data show the effectiveness of the proposed model and algorithm.
Keywords
hot rolling; materials requirements planning; search problems; slabs; steel industry; coiling temperature; discharging temperature; downstream production line; hot rolling planning; industrial data; iron production; jump limit; material requirement; prize collecting vehicle routing; slab surface grade; steel production; variable neighborhood Tabu search; Algorithm design and analysis; Coils; Materials; Planning; Slabs; Vehicles; Variable Neighborhood Tabu Search; downstream production lines; hot rolling planning;
fLanguage
English
Publisher
ieee
Conference_Titel
Intelligent Control and Automation (WCICA), 2010 8th World Congress on
Conference_Location
Jinan
Print_ISBN
978-1-4244-6712-9
Type
conf
DOI
10.1109/WCICA.2010.5554758
Filename
5554758
Link To Document