DocumentCode :
169579
Title :
Solving resource-constrained project scheduling problem by genetic algorithm
Author :
Kadam, Sachin U. ; Kadam, Narendra S.
Author_Institution :
Dept. of Comp. Sci. &Eng., RIT-Islampur, Sangli, India
fYear :
2014
fDate :
9-11 Jan. 2014
Firstpage :
159
Lastpage :
164
Abstract :
This paper proposes a genetic algorithm to solve resource constrained project scheduling problem, in which resources are optimally allocated to tasks. Resources are renewable. In RCPSP each activity is executing in single mode. This work employed genetic algorithm to schedule project task to minimize makespan respect to resource constraint and precedence constraint. The Schedule Generation Scheme was used to decode project plan. The approach was tested on a set of standard problem obtained from Project Scheduling Problem Library (PSLIB) and algorithm given in this paper was compared with the existing optimization algorithm, the result reveals that the algorithm is effective for the RCPSP.
Keywords :
genetic algorithms; resource allocation; scheduling; task analysis; PSLIB; RCPSP; genetic algorithm; project scheduling problem library; project task; resource allocation; resource-constrained project scheduling problem; Computational modeling; Generators; Genetics; Scheduling; Search problems; Sociology; Statistics; Genetic Algorithm; Project Scheduling; Resource Constrain;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Business and Information Management (ICBIM), 2014 2nd International Conference on
Conference_Location :
Durgapur
Print_ISBN :
978-1-4799-3263-4
Type :
conf
DOI :
10.1109/ICBIM.2014.6970966
Filename :
6970966
Link To Document :
بازگشت