DocumentCode :
1699228
Title :
The Cp and Cpk Indexes in Software Development Resource Relocation
Author :
de Mesquita Spínola, Mauro ; de Paula Pessoa, M.S. ; Tonini, A.C.
Author_Institution :
Sao Paulo Univ., Sao Paulo
fYear :
2007
Firstpage :
2431
Lastpage :
2439
Abstract :
In software development, the effort is the measure of process capacity, while resource relocation is one of the potential causes of its variability. Without appropriate capacity, the developer cannot meet the demand; with capacity excess, it creates an idleness that reduces its profitability. Six Sigma proposes the use of Cp capacity index just with process data and Cpk capacity index, when a certain goal is considered. The article analyzes the use of those indexes for effort calculation in some projects of an ERP software developer organization, in which resource relocation is a condition for the businesses. The use of those indexes makes possible to calculate the opportunity cost, that translates the resource relocation cost- benefit relationship and, for this reason, they are used as exchange currency in business negotiations.
Keywords :
DP industry; enterprise resource planning; organisational aspects; process capability analysis; six sigma (quality); software development management; Cpk capacity index; ERP software developer organization; process capacity; six sigma proposes; software development resource relocation; Costs; Decision making; Enterprise resource planning; Investments; Production engineering; Profitability; Programming; Project management; Six sigma; Software quality;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Management of Engineering and Technology, Portland International Center for
Conference_Location :
Portland, OR
Print_ISBN :
978-1-8908-4315-1
Electronic_ISBN :
978-1-8908-4315-1
Type :
conf
DOI :
10.1109/PICMET.2007.4349578
Filename :
4349578
Link To Document :
بازگشت