DocumentCode :
1701052
Title :
Research on molten iron logistics balance model in iron-steel correspondence scheduling
Author :
Huang, Hui ; Xu, Wen ; Zhou, Wei ; Zheng, Binglin ; Chai, Tianyou
Author_Institution :
Key Lab. of Integrated Autom. for Process Ind., Northeastern Univ., Shenyang, China
fYear :
2010
Firstpage :
3980
Lastpage :
3985
Abstract :
Molten iron logistics balance is one of iron & steel production planning and scheduling problems. It lies on the first layer in iron-steel correspondence scheduling system. Productivity constraints of blast furnace and steel-making, demand weight constraints of molten iron for steel-making, weight constraints of on-line molten iron were comprehensively considered and a multi-objective mathematical programming model of molten iron logistics balance problem was established. The multiple objectives including maximizing productivity of blast furnace and steel-making and minimizing transportation cost were taken into account in the model. By conversion method the model was converted into linear programming which can be solved by standard linear programming software. And the evaluation indices of model were computed. The experimental results using practical production data show the proposed model is effective and feasible.
Keywords :
blast furnaces; constraint theory; linear programming; logistics; mathematical programming; mathematics computing; production control; production planning; scheduling; steel industry; blast furnace productivity constraint; blast furnace productivity maximization; iron & steel production planning; iron-steel correspondence scheduling; linear programming software; molten iron demand weight constraint; molten iron logistics balance model; molten iron logistics balance problem; multiobjective mathematical programming model; online molten iron weight constraint; steel making productivity constraint; steel making productivity maximization; transportation cost minimization; Automation; Computational modeling; Iron; Job shop scheduling; Logistics; Mathematical model; Mathematical programming; iron-steel correspondence scheduling; molten iron logistics balance; multi-objective mathematical programming model;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Intelligent Control and Automation (WCICA), 2010 8th World Congress on
Conference_Location :
Jinan
Print_ISBN :
978-1-4244-6712-9
Type :
conf
DOI :
10.1109/WCICA.2010.5554959
Filename :
5554959
Link To Document :
بازگشت