• DocumentCode
    1701490
  • Title

    Optimisation of the Sizewell B Alarm System

  • Author

    Broadhead, N.

  • Author_Institution
    Nucl. Electr. Ltd., Gloucester, UK
  • fYear
    1997
  • fDate
    6/17/1997 12:00:00 AM
  • Firstpage
    42461
  • Lastpage
    42465
  • Abstract
    The Sizewell B Main Control Room (MCR) uses an integrated system for centralised operation, known as WISCO. This is a large distributed computer system made up of three subsystems: the high integrity control system, the process control system, which are control and data acquisition systems; and the distributed computer system (DCS) which is a data processing and display system. The DCS provides the principle source of plant and alarm information via VDU displays, but it is supported by independent indications and alarm facias for nuclear safety purposes. This paper discusses the experience gained with optimisation of the Sizewell B Alarm System
  • Keywords
    alarm systems; Sizewell B Alarm System; Sizewell B Main Control Room; VDU displays; WISCO; alarm information; centralised operation; control and data acquisition systems; data processing and display system; high integrity control syste; integrated system; large distributed computer system; nuclear safety; process control system;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Stemming the Alarm Flood (Digest No: 1997/136), IEE Colloquium on
  • Conference_Location
    London
  • Type

    conf

  • DOI
    10.1049/ic:19970742
  • Filename
    663952