• DocumentCode
    1705993
  • Title

    Demonstrate cost savings, schedule shortenings, etc [software project management]

  • Author

    Buitenkant, Peter

  • Author_Institution
    24 Thorngrove Lane, Dix Hills, NY, USA
  • fYear
    1996
  • Firstpage
    37
  • Lastpage
    40
  • Abstract
    We examine some very specific ways in which a client can realize very dramatic savings, both in schedule and project costs. Bringing in outside resources can either shorten your normal design/development cycle or solve a particularly vexing problem. This allows you, the client to benefit from 4 important considerations: fresh approach by outsider; individual highly skilled in the area of interest; specialised equipment is often made available to the client at little or no cost; and highly motivated to satisfy you, the client
  • Keywords
    project management; software development management; cost savings; design/development cycle; outside resources; schedule shortenings; software project management; vexing problem;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    ELECTRO '96. Professional Program. Proceedings.
  • Conference_Location
    Somerset, NJ
  • Print_ISBN
    0-7803-3271-7
  • Type

    conf

  • DOI
    10.1109/ELECTR.1996.501206
  • Filename
    501206