DocumentCode :
1714705
Title :
Enforcing ramp rate limits on Italian Adjustment Market
Author :
Berizzi, A. ; Bovo, C. ; Delfanti, M. ; Merlo, M.
Author_Institution :
Electr. Eng. Dept., Politec. di Milano, Milano
fYear :
2007
Firstpage :
861
Lastpage :
866
Abstract :
In the Italian day-ahead energy market, it is possible to trade the electrical energy without taking into account the technical limits of the generation units (e.g. minimum up time, minimum down time, ramp rate limits). Therefore, the output of the day-ahead energy market may be not feasible for some generating units. In this case, the relevant market operator has to modify the scheduling of the unit through the participation to the adjustment market. This paper presents a model to define the power profile for generating units on the base of the hourly amounts of energy exchanged in the day-ahead energy market, taking into account the technical constraints of generators (ramp rate limits). The proposed model has been tested using data given by a day- ahead energy market simulator, applied to the Italian electric system.
Keywords :
power generation economics; power generation scheduling; power markets; Italian Adjustment Market; Italian day-ahead energy market; Italian electric system; ramp rate limits; unit scheduling; Contracts; Dispatching; Electricity supply industry; ISO standards; Marketing and sales; Power generation; Power system modeling; Production systems; Scheduling; System testing; Adjustment market; day-ahead energy market; ramp rate limits; zonal market;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power Tech, 2007 IEEE Lausanne
Conference_Location :
Lausanne
Print_ISBN :
978-1-4244-2189-3
Electronic_ISBN :
978-1-4244-2190-9
Type :
conf
DOI :
10.1109/PCT.2007.4538428
Filename :
4538428
Link To Document :
بازگشت