• DocumentCode
    1715590
  • Title

    The Turbogenerator - A Continuous Engineering Challenge

  • Author

    Ginet, C. ; Joho, R. ; Verrier, M.

  • Author_Institution
    ALSTOM, Geneva
  • fYear
    2007
  • Firstpage
    1055
  • Lastpage
    1060
  • Abstract
    Since the 1901 invention of the cylindrical rotor for a high-speed generator, the turbogenerator has been used for converting the steam turbine and gas turbine power into electrical power. Today a wide array of turbogenerators between 50 MVA and 1300 MVA in full-speed (two-pole) design is available. The nuclear power plant business is covered by half- speed (4-pole) designs with a range up to 2000 MVA. Today, the main drivers for design uprates are cooling design and insulation technology. The design development is supported by FEM and CFD, which in future will get linked with mechanical design tools. The future is characterized by new needs regarding power, efficiency and stability, and the commercial availability of emerging material technologies.
  • Keywords
    gas turbine power stations; nuclear power stations; power system stability; turbogenerators; apparent power 1300 MVA; apparent power 2000 MVA; apparent power 50 MVA; cooling design; electrical power; full-speed two-pole design; gas turbine power; half- speed 4-pole designs; high-speed generator; insulation technology; mechanical design tools; nuclear power plant business; steam turbine power; turbogenerator; Business; Computational fluid dynamics; Cooling; Insulation; Nuclear power generation; Power engineering and energy; Power generation; Rotors; Turbines; Turbogenerators;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power Tech, 2007 IEEE Lausanne
  • Conference_Location
    Lausanne
  • Print_ISBN
    978-1-4244-2189-3
  • Electronic_ISBN
    978-1-4244-2190-9
  • Type

    conf

  • DOI
    10.1109/PCT.2007.4538461
  • Filename
    4538461