Rolling Unit Commitment for Systems with Significant Installed Wind Capacity
Author
Tuohy, Aidan ; Denny, Eleanor ; Malley, Mark O.
Author_Institution
Sch. of Electr., Univ. Coll. Dublin, Dublin
fYear
2007
Firstpage
1380
Lastpage
1385
Abstract
As wind power penetration grows, the amount of reserve needed on the system also grows, due to the increases in the uncertainty of wind power, which grows larger as forecast horizon increases. By scheduling the system more often the amount of extra reserve to be carried to cater for wind uncertainty decreases, depending on the flexibility of plant on the system. This reduces the costs of operating the system. There is a trade off between reduced costs due to more frequent commitment, the ability of wind forecasts to be made more accurately, and the increased costs of more flexible plant. This paper examines the benefits of committing the system more frequently, and how different factors such as reliability of the system, accuracy of the forecasts and plant mix impact on this.
Keywords
cost reduction; power generation dispatch; power generation scheduling; wind power; wind power plants; cost reduction; unit commitment; wind capacity; wind power plant scheduling; Costs; Demand forecasting; Economic forecasting; Educational institutions; Load forecasting; Power system reliability; Uncertainty; Wind energy; Wind forecasting; Wind power generation; Costs; Power generation dispatch; Power system economics; Unit Commitment; Wind Forecasting; Wind power generation;
fLanguage
English
Publisher
ieee
Conference_Titel
Power Tech, 2007 IEEE Lausanne
Conference_Location
Lausanne
Print_ISBN
978-1-4244-2189-3
Electronic_ISBN
978-1-4244-2190-9
Type
conf
DOI
10.1109/PCT.2007.4538517
Filename
4538517
Link To Document