• DocumentCode
    1717014
  • Title

    Rolling Unit Commitment for Systems with Significant Installed Wind Capacity

  • Author

    Tuohy, Aidan ; Denny, Eleanor ; Malley, Mark O.

  • Author_Institution
    Sch. of Electr., Univ. Coll. Dublin, Dublin
  • fYear
    2007
  • Firstpage
    1380
  • Lastpage
    1385
  • Abstract
    As wind power penetration grows, the amount of reserve needed on the system also grows, due to the increases in the uncertainty of wind power, which grows larger as forecast horizon increases. By scheduling the system more often the amount of extra reserve to be carried to cater for wind uncertainty decreases, depending on the flexibility of plant on the system. This reduces the costs of operating the system. There is a trade off between reduced costs due to more frequent commitment, the ability of wind forecasts to be made more accurately, and the increased costs of more flexible plant. This paper examines the benefits of committing the system more frequently, and how different factors such as reliability of the system, accuracy of the forecasts and plant mix impact on this.
  • Keywords
    cost reduction; power generation dispatch; power generation scheduling; wind power; wind power plants; cost reduction; unit commitment; wind capacity; wind power plant scheduling; Costs; Demand forecasting; Economic forecasting; Educational institutions; Load forecasting; Power system reliability; Uncertainty; Wind energy; Wind forecasting; Wind power generation; Costs; Power generation dispatch; Power system economics; Unit Commitment; Wind Forecasting; Wind power generation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power Tech, 2007 IEEE Lausanne
  • Conference_Location
    Lausanne
  • Print_ISBN
    978-1-4244-2189-3
  • Electronic_ISBN
    978-1-4244-2190-9
  • Type

    conf

  • DOI
    10.1109/PCT.2007.4538517
  • Filename
    4538517