DocumentCode
1718557
Title
The research on the influence of the start time of the operation on the performance of the Ground Heat Exchanger
Author
Chao, Jiang ; Yanling, Guan
Author_Institution
Coll. of Environ. Sci. & Eng., Chang´an Univ., Xi´an, China
Volume
3
fYear
2011
Firstpage
2296
Lastpage
2299
Abstract
Based on the principle of superposition, the Infinite - length Linear Heat-source Model is applied to the analysis of the long-term performance of Ground Heat Exchanger for Ground Source Heat Pump. It is shown that the inlet and outlet temperatures of the Ground Heat Exchanger vary with the start time of the operation even if under the same annual dynamic load. The result suggests that the load distribution affects the performance of GSHP even if just the time sequences varying. Therefore the start time of the operation must be considered in the feasibility analysis of a GSHP system.
Keywords
geophysical equipment; heat exchangers; heat pumps; annual dynamic load; feasibility analysis; ground heat exchanger; ground source heat pump; infinite-length linear heat-source model; load distribution; long-term performance analysis; superposition principle; Heat engines; Heat pumps; Heat transfer; Heating; Land surface temperature; Load modeling; Temperature distribution; ground source heat pump; long-term performance; start time;
fLanguage
English
Publisher
ieee
Conference_Titel
Water Resource and Environmental Protection (ISWREP), 2011 International Symposium on
Conference_Location
Xi´an
Print_ISBN
978-1-61284-339-1
Type
conf
DOI
10.1109/ISWREP.2011.5893725
Filename
5893725
Link To Document