DocumentCode :
171944
Title :
Further coordination tests between SPDs and between SPD and Equipment
Author :
Rousseau, Alain ; Qibin Zhou ; Yang Zhao
Author_Institution :
SEFTIM, Vincennes, France
fYear :
2014
fDate :
11-18 Oct. 2014
Firstpage :
540
Lastpage :
545
Abstract :
There may be SPD from many manufacturers on the same line. One SPD is installed by the contractor in charge of electrical installation and then various panel boards are used in the installation made by various panel builders. All of them may use a different brand of SPDs. A solution would be to perform the coordination tests proposed by the European CLC TS 61643-12 standard. A preliminary paper was presented at ICLP 2012 and this is a further contribution taking care of comments received.
Keywords :
electrical installation; power apparatus; surge protection; European CLC TS 61643- 12 standard; ICLP 2012; SPD; coordination testing; electrical installation; panel board; panel builder; surge protective device; Clamps; Surge protection; Surges; Switches; SPDs; coordination; equipment; installation; tests;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Lightning Protection (ICLP), 2014 International Conference o
Conference_Location :
Shanghai
Type :
conf
DOI :
10.1109/ICLP.2014.6973183
Filename :
6973183
Link To Document :
بازگشت