• DocumentCode
    1721086
  • Title

    The importance of emergency service plan in major disturbances — experiences and learning´s from case Graninge Kainuu

  • Author

    Potila, Tapio J.

  • Author_Institution
    Eltel Networks Corporation - Finland
  • fYear
    2005
  • Firstpage
    1
  • Lastpage
    3
  • Abstract
    Graninge Kainuu Oy reformulated its strategy and significantly restructured its operations at the end of the year 2001. A cooperation agreement signed with Eltel Networks and outsourcing network construction and maintenance operations to Eltel Networks were part of the changes made. As a result of the restructuring, the number of the company´s employees fell by 60%. The restructuring also affected Graning Kainuu´s own capability to react to major disturbances.
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Electricity Distribution, 2005. CIRED 2005. 18th International Conference and Exhibition on
  • Conference_Location
    Turin, Italy
  • Type

    conf

  • Filename
    5427752