DocumentCode :
1721643
Title :
Condition based risk assessment of electricity towers using high resolution images from a helicopter
Author :
Earp, Graham
Author_Institution :
EA Technology - United Kingdom
fYear :
2005
Firstpage :
1
Lastpage :
5
Abstract :
This paper describes a high resolution image capture system developed by EA Technology for the purpose of performing detailed inspections of power line towers from a helicopter. The system aims to overcome many of the limitations associated with conventional inspection methods. It combines detailed photographic recording with the satellite-based Global Positioning System (GPS) and moving map displays to produce a permanent record of the condition of each tower inspected. The advantages of detailed information capture and archiving/auditing, coupled with ease, speed and a non-intrusive inspection process are demonstrated. The paper concludes by showing how the captured tower condition information is used both to initiate essential maintenance, and also to form the basis of a Condition Based Risk Management (CBRM) regime developed by EA Technology. This helps to predict remaining asset life span and assists network operators in determining their optimum investment strategy.
fLanguage :
English
Publisher :
iet
Conference_Titel :
Electricity Distribution, 2005. CIRED 2005. 18th International Conference and Exhibition on
Conference_Location :
Turin, Italy
Type :
conf
Filename :
5427777
Link To Document :
بازگشت