DocumentCode :
1726166
Title :
Quality planning for software development
Author :
Walton, Tom
fYear :
2001
fDate :
6/23/1905 12:00:00 AM
Firstpage :
104
Lastpage :
109
Abstract :
A historical project is used as a reference model for the verification planning process. The planning equations and an example are presented. The example objective set is to increase the level of defect removal from the final software from the historical level of 35% to about 88% of the defects introduced into the code and to reduce the overall number of delivered defects/KLOC by 85%. The example illustrates the methods used to estimate the phase-by-phase effort required to achieve the specified goal. The use of the planning model and the resulting data in day-to-day activities is also discussed
Keywords :
software engineering; software quality; defect removal phase-hy-phase effort; example objective set; planning equations; quality planning; reference model; software development; verification planning process; Documentation; Equations; Inspection; Phase estimation; Process planning; Programming; Resource management; Software testing; System testing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Computer Software and Applications Conference, 2001. COMPSAC 2001. 25th Annual International
Conference_Location :
Chicago, IL
ISSN :
0730-3157
Print_ISBN :
0-7695-1372-7
Type :
conf
DOI :
10.1109/CMPSAC.2001.960604
Filename :
960604
Link To Document :
بازگشت