DocumentCode :
1728249
Title :
Implementation of a maintenance proficiency testing program at the Calvert Cliffs Nuclear Power Plant
Author :
Price, Wally
Author_Institution :
Baltimore Gas & Electr., Lusby, MD, USA
fYear :
1992
Firstpage :
410
Lastpage :
412
Abstract :
The Calvert Cliffs Nuclear Power Plant recognized a need for a method of evaluating maintenance personnel. Assessing the proficiency levels of personnel required the establishment of an objective, reliable, time-saving, and valid system to evaluate competency. Concurrently, the Electric Power Research Institute (EPRI) had pioneered a process to develop proficiency assessment tests. A cooperative effort was undertaken. The development of proficiency assessment testing of maintenance personnel was performed in a joint effort between Baltimore Gas & Electric and EPRI.<>
Keywords :
nuclear power stations; nuclear reactor maintenance; personnel; Baltimore Gas & Electric; Calvert Cliffs Nuclear Power Plant; EPRI; Electric Power Research Institute; maintenance proficiency testing program; Automatic testing; Contracts; Maintenance; Materials testing; On the job training; Performance evaluation; Personnel; Power generation; Power system reliability; System testing;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Human Factors and Power Plants, 1992., Conference Record for 1992 IEEE Fifth Conference on
Conference_Location :
Monterey, CA, USA
Print_ISBN :
0-7803-0888-3
Type :
conf
DOI :
10.1109/HFPP.1992.283374
Filename :
283374
Link To Document :
بازگشت