DocumentCode
1728821
Title
The use of customer outage cost surveys in policy decision-making: The Italian experience in regulating quality of electricity supply
Author
Bertazzi, Antonella ; Fumagalli, Elena ; Schiavo, Luca Lo
Author_Institution
Autorit?? per l´energia elettrica e il gas - Italy
fYear
2005
Firstpage
1
Lastpage
5
Abstract
This paper summarizes the objectives, the methodological aspects, and the key results of the survey on customer outages cost conducted in Italy in the year 2003. The paper reports the main findings and the estimated costs for various interruption scenarios. The Italian regulatory regime for quality of electricity supply entered a new regulatory period at the beginning of the year 2004: the paper illustrates the decisions made by the regulator on the basis of the described analysis. Finally, the paper comments on the differences in numerical values that were observed in comparison with other surveys.
fLanguage
English
Publisher
iet
Conference_Titel
Electricity Distribution, 2005. CIRED 2005. 18th International Conference and Exhibition on
Conference_Location
Turin, Italy
Type
conf
Filename
5428054
Link To Document