DocumentCode :
1732350
Title :
Performance and design of over head LV bundle conductor systems in an environment of high lightning activity and high pollution
Author :
Geldenhuys, Hendri
Author_Institution :
Eskom, Distribution Technology - South Africa
fYear :
2005
Firstpage :
1
Lastpage :
3
Abstract :
Eskom participates in South Africa´s electrification program which started in 1992 and is still continuing. Eskom made 350 000 connections per year at the peak of the program. Eskom lead the industry in reducing first capital costs in the program by more than 50%. [1]
fLanguage :
English
Publisher :
iet
Conference_Titel :
Electricity Distribution, 2005. CIRED 2005. 18th International Conference and Exhibition on
Conference_Location :
Turin, Italy
Type :
conf
Filename :
5428188
Link To Document :
بازگشت