Title
Minimisation of equipment cost for transfer lines with blocks of parallel tasks
Author
Bratcu, Antoneta Iuliana ; Makdessian, Lina ; Dolgui, Alexandre
Author_Institution
Ind. Syst. Optimisation Lab., Univ. of Technol. of Troyes, France
fYear
2003
Firstpage
109
Lastpage
114
Abstract
This paper deals with the design of single product lines without buffers (transfer lines), which dispose of several types of multifunctional tools (equipments) allowing the parallel execution of many different tasks by the same equipment (blocks of tasks). The production line design is stated as a multi-criteria optimisation problem: balancing the line and minimising the equipment cost. It is decomposed into two sub-problems: first, the blocks are obtained by assigning the tasks to equipments, subject to the precedence constraints; secondly, these blocks are assigned to workstations, subject to the cycle time constraint, which is just the ALB problem. To solve the first sub-problem, a branch-and-bound algorithm, enhanced by using two lower bounds and a dominance rule, is proposed.
Keywords
constraint theory; cost reduction; minimisation; optimisation; parallel processing; workstations; branch-and-bound algorithm; cycle time constraint; dominance rule; equipment cost; equipment cost minimization; multifunctional tools; optimisation problem; parallel execution; parallel tasks; precedence constraints; production line design; single product line design; transfer lines; two lower bounds; workstations; Assembly; Control systems; Cost function; Cows; Design optimization; Electrical equipment industry; Industrial control; Ores; Production; Workstations;
fLanguage
English
Publisher
ieee
Conference_Titel
Assembly and Task Planning, 2003. Proceedings of the IEEE International Symposium on
Print_ISBN
0-7803-7770-2
Type
conf
DOI
10.1109/ISATP.2003.1217196
Filename
1217196
Link To Document