DocumentCode :
1733764
Title :
Northrop Grumman Newport news breakdown cost impact
Author :
Chang, Carole ; Colacurcio, Mike ; Summers, Rick ; Lam, Vin
Author_Institution :
Grado Dept. of Ind. & Syst. Eng., Virginia Polytech. Inst. & State Univ., Blacksburg, VA, USA
fYear :
2005
fDate :
4/29/2005 12:00:00 AM
Firstpage :
338
Lastpage :
342
Abstract :
NGNN had issued the need for a method to analyze machine breakdown costs. Factors such as delay time, bottlenecks, and machine malfunction were evaluated. These issues are unavoidable aspects that result from a company that operates at such a high level. The senior design team at Virginia Tech took on the project and has developed a method to assess these problems. Using industrial engineering processes, the task was to design an algorithm that predicted the breakdown cost given a set downtime. In order to properly develop the algorithm, known and unknown variables had to be computed. Probabilities were calculated to determine how and with what chance the machine breakdown would occur in a given year. With both probabilities and variables known, the algorithm formulated not only met the specified scope but also expanded on its capabilities.
Keywords :
costing; database management systems; design engineering; industrial engineering; probability; production equipment; production facilities; Northrop Grumman Newport news breakdown cost impact; industrial engineering process; machine breakdown cost; senior design team; Costs; Databases; Delay effects; Electric breakdown; Job shop scheduling; Outsourcing; Probability; Project management; Statistics; Systems engineering and theory;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Systems and Information Engineering Design Symposium, 2005 IEEE
Print_ISBN :
0-9744559-4-6
Type :
conf
DOI :
10.1109/SIEDS.2005.193277
Filename :
1497170