DocumentCode
174451
Title
Risk minimizing for power quality measurements. A study case
Author
Stanciu, Niculai ; Stanescu, Cornel ; Szabo, Willibald ; Dobre, Ion
Author_Institution
S.C. Fdee Electr. Distributie Transilvania Sud S.A., Brasov, Romania
fYear
2014
fDate
22-24 May 2014
Firstpage
118
Lastpage
123
Abstract
Measurement results used for Power Quality assessment give an objective evaluation if their trust level is high. This requirement becomes feasible if a system for ensuring measurement quality is already in place and it is adapted to measurements specific domain. The system for ensuring measurement quality is absolutely necessary when measurement results are used to take correct decisions. Because all measurements are accompanied by errors and measurement uncertainty the results are expressed taking into account a certain probability. Sometimes this probability presents a risk if it´s not high enough. This article presents some aspects which can contribute to diminish the risk when PQ measurements are validated.
Keywords
measurement uncertainty; power supply quality; power system measurement; probability; measurement quality; measurement uncertainty; power quality assessment; power quality measurements; risk minimizing; Accuracy; Calibration; IEC standards; Instruments; Measurement uncertainty; Uncertainty; Voltage measurement;
fLanguage
English
Publisher
ieee
Conference_Titel
Optimization of Electrical and Electronic Equipment (OPTIM), 2014 International Conference on
Conference_Location
Bran
Type
conf
DOI
10.1109/OPTIM.2014.6850980
Filename
6850980
Link To Document