DocumentCode :
1744539
Title :
Prerequisites and outlines of joint Euro-Asian electric power infrastructure
Author :
Voropai, N.I.
Author_Institution :
Energy Syst. Inst., Irkutsk
Volume :
1
fYear :
2001
fDate :
28 Jan-1 Feb 2001
Firstpage :
3
Abstract :
Apparently, the tendency to connect power systems by AC and DC links and create large international and intercontinental interconnections is obvious for the specialists. This tendency has been named “globalization of electric power systems”. It is mainly characterized by using system effects, that appear when maneuvering energy resources, generating capacities and power flows. In doing so the main objective of extending and connecting power systems is to supply electric power and power services of high quality and with high reliability to consumers on the whole territory of the interconnection. Here, the author examines the prerequisites of a joint Euro-Asian electric power infrastructure
Keywords :
electricity supply industry; power system interconnection; power system reliability; AC links; Asia; DC links; Europe; energy resources; generating capacities; globalization; interconnected power systems; intercontinental interconnections; international interconnections; joint Euro-Asian electric power infrastructure; power flows; reliability; Control systems; Dispatching; Joining processes; Load flow; Power generation; Power system control; Power system interconnection; Power system reliability; Power systems; USA Councils;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power Engineering Society Winter Meeting, 2001. IEEE
Conference_Location :
Columbus, OH
Print_ISBN :
0-7803-6672-7
Type :
conf
DOI :
10.1109/PESW.2001.916849
Filename :
916849
Link To Document :
بازگشت