Title :
Maintenance scheduling according to reliability targets and actual equipment performance [circuit breakers]
Author :
Polimac, J. ; Polimac, V.
Author_Institution :
PB Power, UK
Abstract :
Maintenance scheduling of circuit breakers according to their reliability targets and actual performance has been considered. A model was developed to calculate maintenance intervals between two preventive maintenance checks. Relationship between the reliability targets, actual performance, maintenance intervals and preventive maintenance costs is discussed and established
Keywords :
circuit breakers; maintenance engineering; power system reliability; scheduling; circuit breaker maintenance scheduling; equipment performance; maintenance intervals; preventive maintenance checks; preventive maintenance costs; reliability targets;
Conference_Titel :
Electricity Distribution, 2001. Part 1: Contributions. CIRED. 16th International Conference and Exhibition on (IEE Conf. Publ No. 482)
Conference_Location :
Amsterdam
Print_ISBN :
0-85296-735-7
DOI :
10.1049/cp:20010798