• DocumentCode
    1750178
  • Title

    Maintenance scheduling according to reliability targets and actual equipment performance [circuit breakers]

  • Author

    Polimac, J. ; Polimac, V.

  • Author_Institution
    PB Power, UK
  • Volume
    3
  • fYear
    2001
  • fDate
    2001
  • Abstract
    Maintenance scheduling of circuit breakers according to their reliability targets and actual performance has been considered. A model was developed to calculate maintenance intervals between two preventive maintenance checks. Relationship between the reliability targets, actual performance, maintenance intervals and preventive maintenance costs is discussed and established
  • Keywords
    circuit breakers; maintenance engineering; power system reliability; scheduling; circuit breaker maintenance scheduling; equipment performance; maintenance intervals; preventive maintenance checks; preventive maintenance costs; reliability targets;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Electricity Distribution, 2001. Part 1: Contributions. CIRED. 16th International Conference and Exhibition on (IEE Conf. Publ No. 482)
  • Conference_Location
    Amsterdam
  • ISSN
    0537-9989
  • Print_ISBN
    0-85296-735-7
  • Type

    conf

  • DOI
    10.1049/cp:20010798
  • Filename
    942940